Operations & Supply Chain

Production

Work centres, planned orders and production registers.

Set up work centres and plan manufacturing orders, and see bills of materials, floor time, inspections, scrap and finished goods as registers. Entry on those screens and stock posting are still being built.

Partly available

Illustration of production workflows

Overview

What Production does for you.

Production planning breaks down when recipes live in one person's head and order status is asked for on the phone. Production keeps your bills of materials, work centres and manufacturing orders in one place, with screens for the time, quality checks, scrap and finished goods recorded against each order.

You define work centres with their capacity and hourly cost, and hold a bill of materials for each product. A manufacturing order then states what to make, how many and by when. As the order progresses, its record shows completed quantity, scrap, inspections and transfers of finished goods to the warehouse.

Features at a glance

What you can do with Production.

The main areas this product covers. We confirm the exact features and setup for your package before you commit.

01

Work centres

Create each work centre with its capacity, efficiency and cost per hour.

02

Manufacturing orders

Create a planned order with the item, quantity, dates and priority.

03

Production schedule

See planned orders by date. Material requirements are a component list and are not netted against stock.

04

Bill of materials

A register of bills with versions, components and scrap allowance. Entry on screen is still being built.

05

Floor time

A register of the hours recorded against each manufacturing order.

06

Quality, scrap and finished goods

Registers of inspections, scrap and finished goods transfers for each order.

07

Cost and performance

Recorded labour cost per order, and planned against completed quantity. Material and overhead cost are not included yet.

In detail

Production, explained in full.

Each area below is part of the product. We confirm the exact features and setup for your package before you commit.

01

Bills of materials and components

The Bill of Materials screen lists each bill with its record number, the product it makes, version, output quantity, configured scrap percentage, validity dates and status. Material Requirements then shows the stored components of each bill: the component, quantity per bill, scrap percentage, issue method, warehouse, substitute group and operation sequence. This gives planners a clear list of what a product needs. It does not yet net requirements against stock on hand or open purchase orders.

  • Bill version and output quantity
  • Scrap percentage per bill and per component
  • Valid-from and valid-to dates
  • Component quantity per bill
  • Issue method and warehouse per component
  • Substitute groups and operation sequence
02

Work centres and routing

A work centre is a machine, line or team where work is done. On Work Centers & Routing you create each one with its name, branch, capacity per hour, efficiency percentage, cost per hour, currency and working calendar. These records describe where the operations of an order take place and what an hour there costs you. From a work centre you can move to the asset register to find the machine behind it.

  • Create and edit work centres
  • Capacity per hour and efficiency
  • Cost per hour with currency
  • Branch and working calendar
  • Status per work centre
03

Planning and manufacturing orders

A Manufacturing Order says what you will make. You create it with the item, quantity, branch, planned start and end dates and a priority. Production Planning / MPS lists the same orders by planned date so the planner can see the schedule. The order record also carries actual start and end dates, completed quantity and scrap quantity, so plan and result sit side by side on one record.

  • Create a planned order with item and quantity
  • Planned start and end dates
  • Priority and status per order
  • Schedule view of all orders
  • Completed and scrap quantity on the order
  • Actual start and end dates
04

Floor time and labour

Floor Time Tracking lists the hours recorded against each manufacturing order: the employee, clock-in and clock-out, regular hours, overtime hours, quantity produced and the value of the work. Supervisors use it to see who worked on which order and for how long. Production Cost Analysis uses these entries to show the recorded labour cost per order beside planned, completed and scrap quantities. Material and overhead cost are not part of that report yet.

  • Clock-in and clock-out per order
  • Regular and overtime hours
  • Quantity recorded per entry
  • Labour cost per manufacturing order
  • Planned against completed quantity
05

Quality, scrap and finished goods

QC Inspections records each check on an order: sample size, accepted quantity, rejected quantity, inspector, date, result and a non-conformance number when something fails. Scrap & By-product Management lists scrap with a reason code and any recovered quantity and value. Finished Goods Transfer shows what moved from the floor to a warehouse, with batch number, serial number and date. Production Performance compares planned, completed and scrap quantities and gives a completion percentage for each order.

  • Sample size, accepted and rejected quantity
  • Inspector, date and result
  • Non-conformance number
  • Scrap with reason code
  • Recovered quantity and value
  • Finished goods by warehouse, batch and serial
  • Completion percentage per order

How it works

From bill of materials to finished goods

  1. 1

    Define the product

    Hold a bill of materials with its components, quantities and scrap allowance.

  2. 2

    Set up work centres

    Create each work centre with capacity per hour, efficiency and cost per hour.

  3. 3

    Plan the order

    Create a manufacturing order with item, quantity, planned dates and priority.

  4. 4

    Follow the work

    Review floor time, completed quantity and scrap recorded against the order.

  5. 5

    Check quality

    Read inspection results with accepted and rejected quantities and any non-conformance number.

  6. 6

    Move finished goods

    See finished goods transferred to the warehouse with batch and serial numbers.

Who uses it

Made for the people who do the work.

Each person sees the screens and records their role allows, and nothing more.

  • Production planner

    A schedule of manufacturing orders by planned date, with component lists from the bill of materials.

  • Floor supervisor

    Hours by employee and order, with completed and scrap quantities on the same record.

  • Quality inspector

    An inspection record for each order with sample size, accepted and rejected quantities and the result.

  • Factory owner

    A dashboard and reports that compare planned and completed quantities and show recorded labour cost.

Reports and records

What you can take out of it.

  • Bill of Materials list
  • Material Requirements list
  • Manufacturing Order
  • Production Planning schedule
  • Floor Time Tracking register
  • QC Inspections register
  • Scrap & By-product register
  • Finished Goods Transfer list
  • Production Cost Analysis

Works with

Better together.

IAKKA products share the same people, customer and company records. Add any of these when you are ready.

Good to know

Questions people ask about Production.

Something else on your mind? Ask us

What can I enter in Production today, and what is view-only?

You can create and edit work centres and planned manufacturing orders. Bills of materials, floor time, inspections, scrap and finished goods transfers appear as registers of the records held for each order. Direct entry on those screens, and automatic issue of materials and receipt of finished goods into stock, are still being completed. We show you the current state before you commit.

Does it calculate material requirements against my stock?

Not yet. Material Requirements lists the components stored on each bill of materials with their quantities and scrap allowance. It does not subtract stock on hand, add open purchase orders or suggest what to buy. Planners use it as a component list for now.

What does Production Cost Analysis include?

It shows the labour cost recorded through floor time for each order, beside planned, completed and scrap quantities. Material cost, overhead and currency conversion are not included yet. Treat it as a view of recorded labour, not a full product cost.

Does it measure machine efficiency or OEE?

No. Production Performance shows completion: planned quantity against completed and scrap quantity for each order. Machine availability, downtime and speed are not captured, so the report is not an OEE measure.

Can I keep more than one version of a bill of materials?

Yes. Each bill of materials carries a version, an output quantity and valid-from and valid-to dates, so an older recipe can stay on record while a newer one is in use.

Is this included in my package?

Partly available. What is included depends on the package and setup you choose. We confirm this in writing before you commit.

How do we get started?

Choose “Book a demo” on this page. Your enquiry will carry this product’s name, so tell us your team size, your current process and the result you need.

Ready to see it with your own process?

Tell us how your team works today. We will show you the products that fit.